1 Introduction

1.1 Background of Study

1.2 Purpose and Scope Work of The Study

1.2.1 Purpose and The Study

1.2.2 Scope Work

1.3 Supervisory Committee, Study Team and Counterpart

1.3.1 Establishment of Supervisory and Special Committees.

1.3.2 Study Team

1.3.3 Counterpart

1.4 Study Schedule

2 Present Situations of Bangalore Urban Transport

2.1 Natural Conditions of Bangalore area

2.1.1 Meteorological Conditions

2.1.2 Geological Condition along the Routes

2.2 Outline of the City

2.2.1 Historical Background

2.2.2 Regional Setting

2.2.3 Population

2.2.4 Industries

2.2.5 Employment

2.2.6 Land Use

2.3 Urban Transport

2.3.1 Means of Urban Transport

2.3.2 Travel Characteristic

2.3.3 Transport Problem

2.4 Future Plan

2.4.1 Population Projection

2.4.2 Employment Projection

2.4.3 Transportation

2.4.4 Industries

2.4.5 Phasing of Development

3 Fundamentals of ELRTS

3.1 Outline of the Project

3.1.1 General

3.1.2 Actions by the government to facilitate project implementation

3.1.3 Some technical feature of the proposed ELRT

3.1.4 Cost of the project

3.2 Routes

3.2.1 Policy on Route Selection

3.2.2 Process of Determining Alternative Plans

3.2.3 Finalized Routes

3.2.4 Comments on Some Specific Requirements on Design of the Project

4 Travel Demand Forecast

4.1 Forecast Methodology

4.1.1 Traffic Data

4.1.2 Traffic Model

4.2 Main Parameters in the Traffic Model

4.2.1 Forecast Years

4.2.2 Traffic Zone

4.2.3 Population and Employment

4.2.4 Per Capita Trip Rate

4.2.5 Floating Population

4.3 Result of Demand Forecast

4.3.1 Traffic Projections

4.3.2 Sensitivity analysis

4.3.3 Phase 1 network

4.4 Review and Comments

5 Train Operation Plan

5.1 Concept of Transport Plan

5.2 Train Operation for Phase 1

5.3 Train Operation for Full Phase

5.3.1 Route

5.3.2 Travel Time Between Stations

5.3.3 Cross-Stations Transport Volume between Stations

5.3.4 Plan for Train Operation Section

5.3.5 Transport Capacity

5.3.6 Number of Vehicle

5.4 Comments

6 Guideway, Stations & Track Plan

6.1 Guideway Plan

6.1.1 Design Concept

6.1.2 Guideway Plan

6.2 Station Plan

6.3 Track and Maintenance Plan

6.3.1 General

6.3.2 Track material

6.3.3 Maintenance

6.4 Comments

6.4.1 Station Plan

6.4.2 Track and Maintenance Plan

7 System Plan

7.1 Rail Vehicles

7.1.1 Design Concept

7.1.2 Specification

7.2 Yard and Shops

7.2.1 Rolling Stock Inspection Plan

7.2.2 Storage of Cars

7.2.3 Car Washing

7.2.4 Daily Inspection

7.2.5 Minor Repair, Replacement of Expendablee and Emergency Repairs

7.2.6 Scheduled Inspection (30 days)

7.2.7 Unscheduled Inspections

7.2.8 Heavy Maintenance and Overhaul

7.2.9 Wheel Turning

7.2.10 Outline of Binnamangala Rolling Stock Depot

7.2.11 Yeswantpur Rolling Stock Depot

7.2.12 Kacharaknahally Rolling Stock Depot

7.2.13 Konankunte Rolling Stock Depot

7.3 Signaling and Communication System

7.3.1 Design Concept

7.3.2 Signaling System Plan

7.3.3 Communication System Plan

7.4 Traction Power

7.4.1 Design Concept

7.4.2 Condition of Plan

7.4.3 Substation

7.4.4 Contact Rail

7.4.5 Other

7.5 Fare Collection System

7.6 Maintenance

7.6.1 Traction Power

7.6.2 Contact Rail

7.6.3 Signaling and Communication

7.7 Comments

7.7.1 Vehicle

7.7.2 Vehicle Depot

7.7.3 Electrical System

8 Environment Impact Assessment

8.1 Introduction

8.2 Major Result of Baseline/Benchmark Studies

8.2.1 Population Increase

8.2.2 Vehicle and Road Accidents Status

8.2.3 Trees to be Affected

8.2.4 Land Use

8.2.5 Ambient Air Quality Status

8.2.6 Ambient Noise Level in Bangalore City

8.2.7 Water Bodies

8.3 Major Results of EIA Study

8.4 Comments

9 Cost Estimate

9.1 General

9.2 Preconditions for Review of Construction Cost Estimate

9.2.1 General

9.2.2 Civil Engineering Structures

9.2.3 Track

9.2.4 System

9.2.5 Rail Vehicle

9.3 Review Result of Construction Cost

9.3.1 General

9.3.2 Civil Engineering Structures

9.3.3 Track

9.3.4 Systems

9.3.5 Rail Vehicle

9.3.6 Summarizing Review

9.4 Cost for Full Phase

9.5 Concluding Remarks

10 Construction Schedule

10.1 General

10.2 Guideway

10.2.1 Construction Method

10.2.2 Construction Schedule

10.3 Track

10.4 Electric Facilities

10.5 Vehicles

10.6 Comments

11 Financial Analysis

11.1 General

11.2 Revenue

11.2.1 Project Ridership of LRTS

11.2.2 Fare Rate

11.3 Cost Estimate

11.3.1 Project Cost

11.3.2 Operation and Maintenance Cost

11.4 Financial Alternatives

11.4.1 Contribution of State Government

11.4.2 Financial Alternatives

1l.5 Internal Rate of Return

12 Concluding Remarks

 

Appendix 3.1-1 Explanation of Table 1-2 by UBTSL

Appendix 4.3-1 Ridership

Appendix 5.3.5 Ridership of Peak Hour & Set Transport Capacity

Appendix 6.1-1 Section showing Central pier for ELRT

Appendix 6.1-2 Section showing 10 m portal for ELRTS

Appendix 6.2-1 Typical C/S of undersulung station

Appendlx 6.2-2 Typical L/S of undersulung station

Appendix 6.2-3 Plan of undersulung station at concourse level

Appendix 6.3-1 Track Master

Appendix 6.3-2 Examination of Sleeper Spacing

Appendix 7.1-1 Rail Vehicle

Appendix 7.2-1 Layout of Binnamangala Depot

Appendix 10-1 Construction Schedule for Sirsi Circle-town Hall Flyover

Appendix 11.5.1 Cash Flow Projection of ELRT without financial Expenditure (Case 1)

Appendix 11.5.2 Cash Flow Projection of ELRT without financial Expenditure (Case 2)

Appendix 11.5.3 Cash Flow Projection of ELRT without financial Expenditure (Case 3)