日本財団 図書館


3.1.4 Cost of the Project

 

The line segments were defined as shown in Fig.3.1-7 in order for them to be used for various feasibility study works including cost estimate.

 

The cost estimate by UBTSL for Phase I is shown in Table 3.1-2 and cost estimate by UBTSL for total Phase is shown in Table3.1-3. In preparing Table 3.1-3, the same unit cost as that for Phase I is applied by UBTSL. JARTS has reviewed UBTSL's cost estimate for Phase I, namely Table 3.1-2. Reviewing results are shown in Chapter 9.

 

 

 

BACK   CONTENTS   NEXT

 






日本財団図書館は、日本財団が運営しています。

  • 日本財団 THE NIPPON FOUNDATION