REPORT ON THE PRELIMINARY STUDY OF THE PROJECT FOR THE CONSTRUCTION OF A NEW TRANSPORT SYSYTEM IN CAPE TOWN IN THE REPUBLIC OF SOUTH AFRICA

 事業名 海外における鉄道技術セミナーの開催
 団体名 海外鉄道技術協力協会 注目度注目度5


REPORT ON THE PRELIMINARY STUDY OF THE PROJECT FOR THE CONSTRUCTION OF A NEW TRANSPORT SYSYTEM IN CAPE TOWN IN THE REPUBLIC OF SOUTH AFRICA

海外鉄道技術協力協会

平成8年度

 

CONTENTS

FOREWORD

CHAPTER 1 INTRODUCTION

1.1 Background and Objectives of the Study

1.2 Outline of the Study

1.3 Implementation Setup of the Study

1.3.1 Establishment of the Committee

1.3.2 Composition of the Study Team

1.4 Study Implementation

1.4.1 Implementation Schedule of the Study in Cape Town

1.4.2 Persons interviewed

1.4.3 Outline of the Study in Cape Town

 

CHAPTER 2 CURRENT CONDITIONS IN THE REPUBLIC OF SOUTH AFRICA

2.1 Natural Conditions

2.2 Socio-economic Conditions

2.2.1 Politics

2.2.2 Population

2.2.3 Gross National Product

2.3 Outline of Urban Transport in Cape Metropolitan Region

2.3.1 General Urban Conditions and Future Plans

2.3.2 Urban Functions

2.3.3 Urban Transport

2.3.4 Problems in the Current Urban Transport Situation

2.3.5 Transport Issues in the Metropolitan Region

 

CHAPTER 3 TRANSPORTATION DEMAND IN THE INNER CITY AREA

3.1 Outline

3.2 Zone Characteristics of the Inner City Area

3.3 Transport Situation by Mode

3.4 Pattern of Commuter Trips in the Inner City Area

3.5 Transport Demand in the Inner City Area

 

CHAPTER 4 ASSESSMENT OF THE EXISTING PLAN FOR CONSTRUCTION OF THE WATERFRONT - CBD (CENTRAL BUSINESS DISTRICT) LRT (LIGHT RAIL TRANSIT)

4.1 Selection of System

4.2 Existing Planned Route

4.2.1 General Background

4.2.2 Assessment of the Existing Plan

4.3 Train Operating Plan

4.4 Amount of Investment

 

CHAPTER 5 PROPOSAL OF AN ALTERNATIVE WATERFRONT - CBD LRT CONSTRUCTION PLAN

5.1 Route Setting

5.2 Demand Forecast

5.2.1 Concerning Past Examinations

5.2.2 Forecast Methodology

5.2.3 Market Segments

5.2.4 Supposed Share of LRT Use

5.2.5 Estimated Number of LRT Users

5.2.6 Peak Hourly Number of Users

5.3 Train Operating Plan

5.4 Managing Plan

5.4.1 Organization

5.4.2 Staffing

5.5 Facilities and Rolling Stock Plan

5.5.1 Track

5.5.2 Stations

5.5.3 Power

5.5.4 Signals and Telecommunications

5.5.5 Rolling Stock Depot

5.5.6 Rolling Stock

5.6 Amount of Investment

5.7 Financial Evaluation

5.7.1 Basic Thinking

5.7.2 Analysis Methodology

5.7.3 Preconditions

5.7.4 Results of Financial Analysis

5.7.5 Sensitivity Analysis

5.7.6 Assessment

 

CHAPTER 6 OTHER CANDIDATE ROUTES FOR LRT OPERATION

6.1 Waterfront-Sea Point

6.2 CBD-District Six

6.3 CBD-Cable Car Station

6.4 CBD-Olympic Facilities

 

CHAPTER 7 IMPACT ASSESSMENT

7.1 Impact on Urban Transport

7.2 Impact on Urban Development Plans

7.3 Environmental Impact Assessment

7.3.1 Air Pollution

7.3.2 Landscape

 

CHAPTER 8 CONCLUSION

8.1 Urban Transport in Cape Town in General

8.2 Waterfront-CBD LRT Plan

8.3 Future Study Direction

8.4 Acknowledgement

 

 

 

成果物の著作権に関するご注意

 

 






サイトに関するご意見・ご質問・お問合せ   サイトマップ   個人情報保護

日本財団会長笹川陽平ブログはこちら



ランキング
注目度とは?
成果物アクセスランキング
5,241位
(31,472成果物中)

成果物アクセス数
641

集計期間:成果物公開〜現在
更新日: 2019年9月14日

関連する他の成果物

1.タイ国国鉄バンコク?チェンマイ間速度向上計画予備調査報告書
2.PRELIMINARY STUDY ON STATE RAILWAY OF THAILAND NORTHERN LINE TRANSPORT TIME REDUCTION
3.SEMINAR ON RAILWAY MODERNIZATION IN MYANMAR
4.SEMINAR ON MODERNIZATION OF RAILWAY TRANSPORT IN CAMBODIA
5.「海外における鉄道技術セミナーの開催」の報告書
6.平成8年度「高密度輸送の快適化の研究」事業研究報告書
  [ 同じカテゴリの成果物 ]


アンケートにご協力
御願いします

この成果物は
お役に立ちましたか?


とても役に立った
まあまあ
普通
いまいち
全く役に立たなかった


この成果物をどのような
目的でご覧になりましたか?


レポート等の作成の
参考資料として
研究の一助として
関係者として参照した
興味があったので
間違って辿り着いただけ


ご意見・ご感想

ここで入力されたご質問・資料請求には、ご回答できません。






その他・お問い合わせ
ご質問は こちら から