shown in Table 3. It is easy for beginner or new students to compose
and operate on the operation picture OPE-1 on switching "START RDY" in green
lump of right procedure and beginning "main engine" by click in the upper
column. The concrete training was enforced in set of condition that it do from status of
dead ship to set up Stand-by (S/B) Engine and running operation.