ISO TC184/SC4/WG3/T23 (Ship Team)
DRAFT
Detail Design
Production Engineering
Operation
The specific lifecycle and applications to be supported by ship application protocols include but are not limited to:
Contract/Functional Design Phase:
Equipment arrangement and connectivity check
Distributive systems flow analysis
Distributive system connectivity check
Graphic representation
Classification type approval
Detail Design Phase:
Interference analysis
Connectivity check
Bill of material
Design engineering analysis (stress analysis, ..)
Graphic representation.
Version control
Classification design approval
Production Engineering Phase:
Fabrication & assembly
Installation & assembly
Version Control/Configuration Management
Manufacturing Survey
Testing
Operation Phase:
Support Engineering
Operational Survey (Class, flag states, port authorities)
Condition monitoring
Performance analysis
Management and control systems
Maintenance
Logistic support
Version Control
6. Evidence of industry need for AP's in this domain.
The ship design, construction, operation and life cycle support process is one of the most complex found in the engineering world. The activities associated with design, construction and service