ATTACHMENT 5 T23 APPLICATION PROTOCOL PROJECT PLAN
ISO TC184/SC4/WG3/T23 (Ship Team)
DRAFT
t23plan3-draft.doc
T23 APPLICATION PROTOCOL PROJECT PLAN SUMMARY
1. Application protocol project plan title:
Ship. Product Model Data Exchange
2. Date of project plan:
original, 1992/06/11
rev 2, 1998/02/04
rev 3, 2000/06/30
3.0 Nominator (ISO TC184/SC4 member body or liaison):
ISO TC 184/SC 4/WG 3/T 23 Ship Team
4. Proposal advocates:
Jim Mays
Naval Sea Systems Command
2531 Jefferson Davis Highway
Code 05R2
Arlington, VA 22242-5160
USA
+1 703 602-2151 x205 fax: +1 703 602-0059
maysjl@navsea.navy.mil
Uwe Langbecker
Germanischer Lloyd AG
P.O.B. 111606
D-20416Hamburg
Germany
+49 40-36149-983 fax: +49 40-36149-7320
lgb@germanlloyd.org
5. Scope of the AP planning project:
The ship AP Project Plan defines the information necessary to describe various ship data functional areas including structural systems, distribution system sand mission subsystems/equipment to be exchanged between dissimilar product model definition systems. The project plan concerns itself with four major application areas that correspond to major stages of a ship's life cycle:
Contract/Functional Design