日本財団 図書館


MEPC 43/4
ANNEX 1
Page 36

Part B, Section 2.B

B. If the flow through method is used, caution should be exercised, since:
.1 air pipes are not designed for continuous ballast water overflow;
.2 current research indicates that pumping of at least three full volumes of the tank capacity could be needed to be effective when filling clean water from the bottom and overflowing from the top; and
.3 certain watertight and weathertight closures (e.g. manholes) which may be opened during ballast exchange, should be re-secured.

 

No proposed amendments
Part B, Section 2.C

C.    The ballast water management plan shall include a list of circumstances in which ballast water exchange should not be undertaken. These circumstances may result from critical situations of an exceptional nature, force majeure due to stress of weather, or any other circumstances in which human life or safety of the ship is threatened.

No proposed amendments

 

H:/MEPC/43/4.WPD

MED/MN/HBu/jeh

 

 

 

前ページ   目次へ   次ページ

 






日本財団図書館は、日本財団が運営しています。

  • 日本財団 THE NIPPON FOUNDATION