See the paragraph for comments on the problems of sharing a section. (2) Setting Transport Capacity (a) Red line in 2011 Central section: Two-car trains at headway of 3.5 minutes Peripheral sections: Two-car trains at headway of 7 minutes
See the paragraph for comments on the problems of sharing a section.
(2) Setting Transport Capacity
(a) Red line in 2011
Central section: Two-car trains at headway of 3.5 minutes
Peripheral sections: Two-car trains at headway of 7 minutes
BACK CONTENTS NEXT