Table 1. The Principal particulars of the Training Ship Yuge-maru III
Length (OA)
40.00 [m]
Length (PP)
35.00 [m]
Breadth (Mid.)
8.00 [m]
Depth (Mid.)
3.30 [m]
Full Load Draft (Mid)
2.28 [m]
Trial Max. Speed
13.75 [kts]
Complement
56 [P]
Endurance
2,300 [miles]
Table 2 Principal specifications of main engine(TSYM)
Middle Speed Diesel Engine
1,300PS x 750[rpm] 1 set
Reduction Gear 1 set
C P P 1 set
L.O.system
Compressed air system
Cool.F.W.system
M/E remote control device
Cool.S.W.system
CPP remote control device
F.O.system
M/E warming up Heater
Table 3 Program list of the engine system of training items
1) Warming up Operation
2) Main Engine Start I Stop Operation
3) Output regulation by CPP and shaft rotation
4) Operation lubricating oil, fuel oil, cooling fresh water, cooling
seawater, compressed air system
5) Calculation of fuel consumption rate
well as land system. She has the newest equipments in addition to LAN
system and therefore we believe that will be useful for development of future navigation
technologies.
In this paper, we introduce the brief concepts of ship's LAN system
about her's hardware and software. There are the general arrangement of her shown in Fig 1
and the information processing system (IPS) in Fig 2. Recently the smaller number of crew
have to operate and deal with the more complicate marine engine system. Therefore in case
of MET we have to educate the more subjects in curriculum and train the more of
experiments for sea going students for MET of YNCMT. It is