日本財団 図書館


 

Table 1. The Principal particulars of the Training Ship Yuge-maru III

Length (OA)   

40.00 [m]

Length (PP)   

35.00 [m]

Breadth (Mid.)   

8.00 [m]

Depth (Mid.)   

3.30 [m]

Full Load Draft (Mid)   

2.28 [m]

Trial Max. Speed   

13.75 [kts]

Complement   

56 [P]

Endurance   

2,300 [miles]

Table 2 Principal specifications of main engine(TSYM)

Middle Speed Diesel Engine  

1,300PS x 750[rpm]  1 set

Reduction Gear 1 set  

C P P    1 set

L.O.system  

Compressed air system

Cool.F.W.system  

M/E remote control device

Cool.S.W.system  

CPP remote control device

F.O.system  

M/E warming up Heater

Table 3 Program list of the engine system of training items

1) Warming up Operation

2) Main Engine Start I Stop Operation

3) Output regulation by CPP and shaft rotation

4) Operation lubricating oil, fuel oil, cooling fresh water, cooling seawater, compressed air system

5) Calculation of fuel consumption rate

 

well as land system. She has the newest equipments in addition to LAN system and therefore we believe that will be useful for development of future navigation technologies.

In this paper, we introduce the brief concepts of ship's LAN system about her's hardware and software. There are the general arrangement of her shown in Fig 1 and the information processing system (IPS) in Fig 2. Recently the smaller number of crew have to operate and deal with the more complicate marine engine system. Therefore in case of MET we have to educate the more subjects in curriculum and train the more of experiments for sea going students for MET of YNCMT. It is

 

 

 

前ページ   目次へ   次ページ

 






日本財団図書館は、日本財団が運営しています。

  • 日本財団 THE NIPPON FOUNDATION