Exception report for the progress of work in ISO/TC8/SC3 (continued)
5. Changes in the participation of ISO/TC8/SC3 members in SC3 working groups are as follows [with changes marked by an asterisk (*)]:
- WG 7 Heating, ventilation, and air-conditioning
- Convener: Vacant*
- Participation: Denmark, Germany, Japan, USA
- WG8 Piping systems
- Convener: Mr. Douglas R. Dole (Victualic Company of America) of USA (ANSI)
- Participation: Denmark, Germany, Japan*, Romania, Russian Federation, UK, USA
6. Four standards reached the publication stage bringing the total to 26. Additions to the list of published standards are as follows:
[03.23] ISO 14726-1:1999* Ships and marine technology - Identification colours for the content of piping systems - Part 1: Main colours and media
[03.25] ISO 15364:2000* Ships and marine technology - Pressure/vacuum valves for cargo tanks
[03.26] ISO 15540:1999* Ships and marine technology - Fire resistance of hose assemblies - Test methods
[03.27] ISO 15541:1999* Ships and marine technology - Fire resistance of hose assemblies - Requirements on the test bench
7. Changes in the status of the remaining 21 active work items under consideration in the ISO/TC8/SC3 Programme of Work are indicated as follows (with changes marked by an asterisk):
[03.20] ISO/DIS* 9785 Ships and marine technology - Ventilation of cargo spaces where internal combustion engine vehicles may be driven -Calculation of theoretical total airflow required
Responsible working group Working Group 7 (USA)
Stage 40.60
Target date for FDIS 00-12
[03.22] ISO/DIS* 13617 Ships and marine technology - Shipboard incinerators - Requirements
Responsible working group Working Group 2 (USA)
Stage 40.60
Target date for FDIS 00-11