NAV 44/3
LANDFALL OFF LOBOS DE AFUERA ISLAND
(Reference chart: PERU - HIDRONAV - 1200 Ed.1973
Note: the chart is based on Canoa 1956 (Venezuela) Datum.)
Description of traffic separation scheme
(a) A separation zone 3 miles wide, bounded by a line
connecting the the folloving geographical points:
(1) 06E47.7'S; 80E59.8'W
(2) 07E03.0'S; 80E52.0'W
(3) 07E08.0'S; 80E48.5'W
(a1) A traffic lane 4.5 miles wide on each side of the separation zone
(a2) Principal traffic bearing:
153E - 333E and 145E - 325E
(b) A separation zone 2 miles wide, bounded by a line
connecting the following geographical points:
(1) 06E41.4' S; 80E53.0' W
(2) 06E49.1' S; 80E38.5' W
(3) 06E52.2' S; 80E33.2' W
(bl) A traffic lane 3.5 miles wide on each side of the
separation zone
(b2) Principal traffic bearing:
118E - 298E and 122E - 302E
LANDFALL OFF PUERTO SALAVERRY
(Reference chart: PERU - HIDRONAV - 1270 Ed.1988
Note:the chart is based on Canoa 1956 (Venezuela)Datum.)
Description of traffic separation scheme
(a) A_ separation zone 0.5 miles wide, bounded by a line
connecting the
following geographical points:
(1) 08E13.1'S; 79EOI.O'W
(2) 08E13.1'S; 79E03.0'W
(b) A traffic lane for westbound traffic between the
separation zone and a lineconnecting the following
geographical points :
(3) 08E12.5'S; 79EO1.0'W
(4) 08E11.2'S; 79E03.0'W
(c) A traffic lane for eastbound traffic between the
separation zone and a lineconnecting the following
geographical points :
(5) 08E13.6'S; 79E01.0'W
(6) 08E15.0'S; 79E03.0'W
(d) Principal traffic bearings:
090E - 270E and 055E - 305E
I:/NAV/44/3.WPD