・Bekasi Line
- Route : Jatinegara-Cakung-Bekasi (15km)
- Facility : Double Track, Electrified, Automatic Signal
- Operation : Mixed operation by intercity, commuter and freight
trains with over line capacity
- Future : Track Separation on Jatinegara-Bekasi,
Sub-Terminal Station at Jatinegara
・Serpong/Merak Line
- Route : Tanah Abang-Kebayoran-Serpong (22km)
- Facility : Single Track, Electrified, Automatic Signal
- Operation : Mixed operation by commuter and freight trains
- Future : Double Track on Tanah Abang-Serpong,
Track Connection for main route line
・Tangerang Line
- Route : Duri-Tangerang (19km)
- Facility : Single Track, None-Electrified, Mechanical Signal
- Operation : Only commuter trains
- Future : Double Track and Electrification on Duri-Tangerang