This Study was a continuous study by JTCA based on the above proposed plan and is to conduct the further development for Quadruple Tracking on Bekasi Railway Line including the justification by Pre-Feasibility for the future implementation.
1.2 Study Team
The survey and study were conducted by the following Team Member.
・Special Advisor
Akira OTAKE ................ Managing Director
Japan Transport Cooperation Association
・Team Leader (Railway Planner)
Isao SHICHINOHE ............ Manager of Railway Transport
Pacific Consultants International
・Team Member (Railway Engineer)
Toshiaki YAMAKAWA ........ Assistant Manager of Railway Transport
Pacific Consultants International
1.3 Survey Record
Field reconnaissance was conducted from September 28 to October 11,1997, as listed on the following records, especially for survey and data collection.
1997/SEP/28 (SUN) Travelling from Tokyo to Jakarta
29 (MON)Courtesy Call to the Government Officials in Jakarta
30 (TUE) Travelling to Bandung
OCT/01(WED) Courtesy Call to PERUMKA Bandung
02(THU) Field Survey from Tanah Abang to Bekasi
03(FRI) Field Survey from Bekasi to Cikarang
04(SAT) Data Collection of Land Use Condition
05(SUN) Field Survey at Tanjung Priok area
06(MON) Field Survey at Eastern Line area
07(TUE) Data Analysis for Alignment Plan
08(WED) Data Analysis for Bekasi Corridor Plan
09(THU) Data Analysis for New Bekasi Line Plan
10(FRI) Discussion with DGLC
11(SAT) Data Analysis for Works in Japan
Preliminary analysis and further activity for data and information collection were conducted from October 12 to November 15, 1997 by the Study Team staying in Indonesia.