(5) Pattern of Train operation Diagram and car Rotation during Peak Hour
We drew up a train operation diagram based on the aforementioned train operation plan, and determined a pattern of train operation for peak hours as shown in Fig 5.2-3
(6) calculation of Number of Cars
We determined the number of cars required for peak hours based on the pattern of train operation diagram as follows.
When the entire network will not have been completed in 2011, transport demand may be smaller than the above estimate. (nearly 50%) Therefore, trains may be operated at intervals of 5 minutes with two-thirds the cars calculated above.