Practical Training Schedule
IHI Kure Works
Training Period: June 13 (Thu)-June 21 (Fri), 2002
Names of Participants:
Mr. Patricio Ivan Andrade Elgueta (Chile)
Mr. Serhan Osman Gencel (Chile)
Mr. Mohamed Abd. Elall Ibrahim Hagag (Egypt)
Mr. Taner Golgeleyen (Turkey)
Date |
Time |
Training Item |
Jun. 13 Thu. |
9:30〜12:00 |
Orientation, Safety Instruction |
13:30〜16:00 |
Outline of Yard Layout and Observation |
14 Fri. |
9:30〜12:00 |
Activities of Sales Business Department |
13:30〜16:00 |
Activities of Design Department, Hull Design |
17 Mon. |
9:30〜12:00 |
Delivery of Container Ship, Macinery Design |
13:30〜16:00 |
Electrical Design, CIM |
18 Tue. |
9:30〜12:00 |
Production Control, Material Procurement |
13:30〜16:00 |
Production Planning, Mold Loft |
19 Wed. |
9:30〜12:00 |
Fabrication (Sub Assembly) |
13:30〜16:00 |
Erection |
20 Thu. |
9:30〜12:00 |
Hull Fitting |
13:30〜16:00 |
Painting |
21 Fri. |
9:30〜12:00 |
Quality Control & Inspection |
13:30〜16:00 |
Summary of Training |
|
Practical Training Schedule
SHI Yokosuka Shipbuilding Works
Training Period: June 25 (Tue)〜July 3 (Wed), 2002
Names of Participants:
Mr. Patricio Ivan Andrade Elgueta (Chile)
Mr. Serhan Osman Gencel (Chile)
Mr. Mohamed Abd. Elall Ibrahim Hagag (Egypt)
Mr. Taner Golgeleyen (Turkey)
Date |
Time |
Training Item |
Jun. 25th Tue. |
9:30〜12:00 |
Production Engineering: Welding |
13:30〜16:00 |
Outline of Yard Layout and Observation |
26th Wed. |
9:30〜12:00 |
Piping Fabrication |
13:30〜16:00 |
Block Inspection |
27th Thu. |
9:30〜12:00 |
Quality Control |
13:30〜16:00 |
Cost Control |
28th Fri. |
9:30〜12:00 |
Computer System |
13:30〜16:00 |
Piping Fabrication |
Jul. 1st. Mon. |
9:30〜12:00 |
Ship Design: Lines |
13:30〜16:00 |
Ship Design: Hull Structure |
2nd Tue. |
9:30〜12:00 |
Ship Design: Outfitting |
13:30〜16:00 |
Ship Design: Computer |
3rd Wed. |
9:30〜12:00 |
Ship Design: Arrangement |
13:30〜16:00 |
Ship Design: Electric |
|
Practical Training Schedule
KHI Sakaide Works
Training Period: July 5 (Fri)〜July 12 (Fri), 2002
Names of Participants:
Mr. Patricio Ivan Andrade Elgueta (Chile)
Mr. Serhan Osman Gencel (Chile)
Mr. Mohamed Abd. Elall Ibrahim Hagag (Egypt)
Mr. Taner Golgeleyen (Turkey)
Date |
Time |
Training Item |
July 5 Fri. |
8:30〜12:00 |
Orientation, Naming Ceremony of New Ship, Outline of Production
Plant |
13:00〜17:00 |
Quality Assurance and Inspection |
8 Mon. |
8:30〜12:00 |
Quality Assurance and Inspection |
13:00〜17:00 |
Ship Repair (Hull and Machinery) |
9 Tue. |
8:30〜12:00 |
Ship Design |
13:00〜17:00 |
Ship Design |
10 Wed. |
8:30〜12:00 |
Ship Production |
13:00〜17:00 |
Ship Production |
11 Thu. |
8:30〜12:00 |
Ship Construction |
13:00〜17:00 |
Ship Construction |
12 Fri. |
8:30〜12:00 |
Ship Construction |
13:00〜17:00 |
Summary of Training |
|
Practical Training Schedule
Hitachi Zosen Corporation, Ariake Works
Training Period: July 16 (Tue)July 24 (Wed), 2002
Names of Participants:
Mr. Patricio Ivan Andrade Elgueta (Chile)
Mr. Serhan Osman Gencel (Chile)
Mr. Mohamed Abd. Elall Ibrahim Hagag (Egypt)
Mr. Taner Golgeleyen (Turkey)
Date |
Time |
Training Item |
July 16 Tue. |
9:00〜12:00 |
Introduction of Ariake Works, Yard Tour |
13:00〜16:30 |
Hull Design |
17 Wed. |
9:00〜12:00 |
Outfitting Design |
13:00〜16:30 |
Block Assembly (Cutting, Sub Assembly, Assembly |
18 Thu. |
9:00〜12:00 |
Hull Construction (Grand Assembly, Dock, Crane, Scaffolding) |
13:00〜16:30 |
Outfitting (Machinery, Operation), Painting |
19 Fri. |
9:00〜12:00 |
Quality Assurance (Inspection Plan/Procedure) |
13:00〜16:30 |
Quality Assurance (Attendance of Inspection) |
23 Tue. |
9:00〜12:00 |
CIM, Robotics |
13:00〜16:30 |
Welding Procedure |
24 Wed. |
9:00〜12:00 |
Safety & Environment |
13:00〜16:00 |
Discussion and Reporting |
|
|