日本財団 図書館


[SC8]
(1) standards to be developed as soon as possible
Title of Possible proposals for NWI, IMO-link-NR TC8 Decision
[08.19R] NP 9519:1990 Shipbuilding and marine structure - Rungs for dog-step ladders (Taken over from SC4, should be reviewed 2001) (IMO-link-NR --)  
(2) other proposals under consideration with lower priority
Title of Possible proposals for NWI, IMO-link-NR TC8 Decision
 
(3) dormant inactive items
Title of Possible proposals for NWI, IMO-link-NR TC8 Decision
 
(4) items proposed for cancellation or transfer to another Subcommittee
Title of Possible proposals for NWI, IMO-link-NR TC8 Decision
SC 1 ; possible proposals for new work item
[1.20] Composite materials
ANSI : Regarding item [1.20] Composite materials, coordination with SC 1 should be maintained regarding fire test and fire endurance standards.
JISC : We identified that IMO/FP is now discussing about the feasibility/requirements for fire protection to use GFRP as hull and structural materials for high speed craft. If you have this in your mind, this should be handled by SC1 or close liaison with SC1 should be taken in case to handle by SC8. (IMO-link-NR --)
 
SC 2 ; possible proposals for new work item
[new work item proposal or monitored as possible future work]
[02.27] Strength assessment (former WG 2 topic 11)
ANSI : The US supports the transfer of the work item to ISO/TC8/SC8.
JISC : We support to transfer this item to SC8. (IMO-link-NR --)
 
SC 10 ; deleted items
[10.18] Hull stress monitoring system (HSMS)/ Voyage data recorder
IMO-link-NR33 (former items)
ANSI : The US supports the transfer of the work item to ISO/TC8/SC8.
JISC : Classification Societies have the regulation for this item. We do not see the necessity to focus this item by changing the responsible SC. In case SC 8 undertakes this item, it is preferable to maintain liaison with SC 10. (IMO-link-NR --)
 
[08.02R] 1095 Revision of ISO 1095 Shipbuilding and marine structures - Toughened safety glass panes for side scuttles(IMO-link-NR --)  
[08.05R] CD 3434:1992 Revision of ISO 3434 Shipbuilding and marine structures - Heated glass panes for ship's rectangular windows (CD will be circulated in June 2001, stage 00.90) (IMO-link-NR --)  
[08.23] No title, other new item should be put (Deleted item) (IMO-link-NR --)  
[08.24] Corrosion prevention systems for seawater ballast tanks (Deleted item) (IMO-link-NR --)  
 
[SC9]
(1) standards to be developed as soon as possible 
Title of Possible proposals for NWI, IMO-link-NR TC8 Decision
No item to consider  
(2) other proposals under consideration with lower priority 
Title of Possible proposals for NWI, IMO-link-NR TC8 Decision
[09.13] Standards for maneuverability (IMO-link-NR52)
Intent of this item seems to be same as [09.26]. Unify both items and await for proposals from Denmark as a member of CEN/TC300.
 
[09.26] Standards for maneuverability, covering items of IMO Res.
A.751(18)
See item [09.13]
 
(3) dormant inactive items 
Title of Possible proposals for NWI, IMO-link-NR TC8 Decision
[09.15] Wing in Ground (WG) Craft (IMO-link-NR 32)
TC8 N864:1995 listed this item as "Work items of mutual interest to IMO and ISO/TC8, then transferred to N 1000 in 1997. Since then no proposal for NWI from members. Demand for WG craft in the market very scarce.
 
[09.21] Compendium of definitions of watertight, weathertight, splashtight, dusttight, gastight, vacuumtight etc. (IMO-link-NR --)
This item was proposed at 13th TC8 Meeting held in 1994. However no proposal for NWI up to today.
For information, this item is related to Load Line Conventions.
 
(4) items proposed for cancellation or transfer to another Subcommittee 
Title of Possible proposals for NWI, IMO-link-NR TC8 Decision
[09.16] Combined pusher tug-barge safety Standards (IMO-link-NR36) Considering that this item covers safety standards of pusher tug-barge, appropriate to be transferred to SC7 or SC11.  
[09.17] Guidelines for design, construction and operation of passenger submersible craft (IMO-link-NR 37) As it seems that the purpose of this item is to cover design, construction etc. of passenger submersible craft, appropriate to be transferred to SC8.  
[09.22] Engine room arrangements, including human factors
(IMO-link-NR--) This item was discussed at IMO/DE, listed in TC8 N 1000 R1 and revised in 1998 as possible proposals for NWI of SC9 but no proposal for NWI from members since then. As it considered that main concern of this item is Engine room arrangements, appropriate to be transferred to SC3.
 
[09.27] Guidelines for maintenance and monitoring of onboard materials containing asbestos(IMO-link-NR--) This item was listed in N 1000.
Consider that this is important item however this item is related environmental issue and in the meantime SC8 expressed intention to take up similar item titled "composite material" at their SC. and therefore propose to be transferred to SC2 or SC8.
 
[09.14] Standard practices for human engineering design of marine systems, equipment and facilities (NWI not approved, only 4 participants, deleted item, stage 00.98) (IMO-link-NR --)  
[09.18] Standards related to High Speed Craft (HSC) (Deleted item, stage 00.98) (This item is already shift to SC6) (IMO-link-NR --)  
[09.19] Standards on Ro/Ro ferry safety (Deleted item, stage 00.98)(This item should be transferred to SC8) (IMO-link-NR --)  
 
[SC10]
(1) standards to be developed as soon as possible
Title of Possible proposals for NWI, IMO-link-NR TC8 Decision
(10.19) Ship Safety Record (IMO Link No. 54)  
(10.20) Safety in shipping and environmentally friendly shipping (IMO-link-NR --)  
(2) other proposals under consideration with lower priority
Title of Possible proposals for NWI, IMO-link-NR TC8 Decision
(3) dormant inactive items
Title of Possible proposals for NWI, IMO-link-NR TC8 Decision
(4) items proposed for cancellation or transfer to another Subcommittee
Title of Possible proposals for NWI, IMO-link-NR TC8 Decision
[10.18] Hull stress monitoring systems (HSMS)/ Voyage data recorder (IMO-link-NR33 (former item))  
 
[SC11]
(1) standards to be developed as soon as possible
Title of Possible proposals for NWI, IMO-link-NR TC8 Decision
(2) other proposals under consideration with lower priority
Title of Possible proposals for NWI, IMO-link-NR TC8 Decision
(3) dormant inactive items
Title of Possible proposals for NWI, IMO-link-NR TC8 Decision
(4) items proposed for cancellation or transfer to another Subcommittee
Title of Possible proposals for NWI, IMO-link-NR TC8 Decision







日本財団図書館は、日本財団が運営しています。

  • 日本財団 THE NIPPON FOUNDATION