| |
AM |
PM |
| 9/27 (FRI) |
Guidance of Nagasaki Maritime Branch |
| 28 (SAT) |
|
| 29 (SUN) |
|
| 30 (MON) |
Tour of Nagasaki City |
| 10/1 (TUE) |
Preliminary Inspection (Kiyomoto Iron & Machinery Works Co.,LTD.:Stockless Anchor)+Welcome Party |
| 2 (WED) |
Ship Inspection (Evergreen Shipyard Corp.:Periodical Inspection of "Sakurajima No.8") |
| 3 (THU) |
Ship Inspection (Watanabe Shipbuilding Co.,LTD.:Periodical Inspection of "S.No.101") |
| 4 (FRI) |
Ship Inspection (Shimabara Dock Society:Intermediate Inspection of "Ferry Osumi No.7") |
| 5 (SAT) |
|
| 6 (SUN) |
|
| 7 (MON) |
Ship Inspection (Watanabe Shipbuilding Co.,LTD.:Periodical Inspection of "S.No.101") |
| 8 (TUE) |
Ship Inspection(Shimabara Dock Society(Nagasaki Works):Intermediate Inspection of "Ferry Esaki No.11") |
| 9 (WED) |
Preliminary Inspection (Mitsubishi Heavy Industries:Turbo-charger) |
Port State Control(Matsugae Wharf,Nagasaki Port) |
| 10 (THU) |
Preliminary Inspection (Mitsubishi Heavy Industries:Turbo-charger) |
| 11 (FRI) |
Preliminary Inspection (Shukosha Corp.:Turbo-charger) |
| 12 (SAT) |
|
| 13 (SUN) |
|
| 14 (MON) |
|
| 15 (TUE) |
Ship Inspection (Miura Shipbuilding Corp.:Periodical Inspection of "Daiwa maru") |
| 16 (WED) |
Ship Inspection (Nagasaki Shipyard Co., LTD.:Intermediate Inspection of "Tateyama maru") |
| 17 (THU) |
Tour of the factory (Mitsubishi Heavy Industries Co.,LTD.) |