DATE |
Time |
LOCATION |
SUBJECT |
remark |
Sep 26 THU |
PM |
arrival at Kobe Office from Osaka office |
|
stay in JICA Center:Tel078-261-0341/国際事業団兵庫国際センター(神戸市中央区脇浜海岸通1−5−2) |
27 FRI |
AM |
at Kobe Office |
Orientation for JG inspection & visiting every room |
|
PM |
KANAGAWA shipbuilding Co., Ltd |
Periodical Inspection |
constructing new ship (Sno.509 & RYUO-MARU) |
28 SAT |
AM |
day off |
|
|
PM |
|
|
|
29 SUN |
AM |
day off |
|
|
PM |
|
|
|
30 MON |
AM |
Kobe port |
PSC inspection |
|
PM |
at Office |
Orientation for PSC inspection |
|
Oct 1 TUE |
AM |
Kawasaki heavy industries, LTD |
Preliminary inspection |
elastic rubber coupling |
PM |
Kobe port |
Observation of Kobe port & Akashi bridge |
by office ship (HARUKAZE) |
2 WED |
AM |
TAKAHARA Ship building Co., Ltd |
Intermediate Inspection |
afloat inspection (EIRIKl-MARU) |
PM |
↑ |
↑ |
|
3 THU |
AM |
|
|
|
PM |
Nagano Dock-yard |
Intermediate Inspection |
passenger ship (FUKI5) |
4 FRI |
AM |
Kawasaki heavy industries, LTD |
Preliminary inspection |
Controllable Pitch Propeller |
PM |
KANAGAWA ship building Co., Ltd |
Periodical Inspection |
constructing new ship (Sno.509 & Sno.511 ) |
5 SAT |
AM |
day off |
|
|
PM |
|
|
|
6 SUN |
AM |
day off |
|
|
PM |
|
|
|
7 MON |
AM |
KANAGAWA ship building Co., Ltd |
Periodical Inspection |
constructing new ship (Sno.509) |
PM |
MAROL Co., Ltd |
Preliminary inspection |
steering gear & remote control panel for water jet propulsion system |
8 TUE |
AM |
at Office |
PSC inspection lecture |
|
PM |
Kobe port |
PSC inspection |
by office ship (HARUKAZE) |
9 WED |
AM |
IHI AMTEC |
Observation |
Bulk Carrier dock delivery |
PM |
DU |
↑ |
engine factory |
10 THU |
AM |
Kobe port |
PSC inspection |
with Himeji PSCO |
PM |
↑ |
↑ |
|
11 FRI |
AM |
Kobe port |
PSC inspection |
by office ship (HARUKAZE) |
PM |
↑ |
↑ |
|
12 SAT |
AM |
day off |
|
|
PM |
|
|
|
13 SUN |
AM |
day off |
|
|
PM |
|
|
|
14 MON |
AM |
day off |
national holiday |
|
PM |
|
|
|
15 TUE |
AM |
Yanmar Co., Ltd (Tsukaguchi factory ) |
Preliminary inspection |
air compressor |
PM |
Kobe port |
PSC inspection |
by office ship (HARUKAZE) |
16 WED |
AM |
|
|
|
PM |
MITSUBISHI heavy industries, Ltd (Takasago Factory ) |
Preliminary inspection |
Evaluation & Fare well party |
17 THU |
AM |
at Office |
Evaluation by Director of Maritime Safety and Environment Department |
|
PM |
leave Kobe office |
visit the room of Director-General of Kobe District Transport Bureau |
|