|
Practical Training Schedule
Fukuoka Shipbuilding
Training Period: June 13 (Thu)-July 2 (Tue), 2002
Names of Participants:
Mr. Yan Sibarang Tandiele (Indonesia)
Mr. Watchara Chiemanukulkit (Thailand)
| Date |
Training Item |
| Jun. 13 |
Thu.
|
Orientation, Ship Planning |
| 14 |
Fri.
|
Basic Design |
| 17 |
Mon.
|
Hull Outfitting, Hull Piping |
| 18 |
Tue.
|
Machinery Outfitting, Electrical
Equipment |
| 19 |
Wed.
|
Ship Inspection, Welding Inspection,
Schedule Planning, etc. |
| 20 |
Thu.
|
Ship Inspection, Welding Inspection,
Schedule Planning, etc. |
| 21 |
Fri.
|
Ship Inspection, Welding Inspection,
Schedule Planning, etc. |
| 24 |
Mon.
|
Ship Inspection, Welding Inspection,
Schedule Planning, etc. |
| 25 |
Tue.
|
Ship Inspection, Welding Inspection,
Schedule Planning, etc. |
| 26 |
Wed.
|
Ship Inspection, Welding Inspection,
Schedule Planning, etc. |
| 27 |
Thu.
|
Ship Inspection, Welding Inspection,
Schedule Planning, etc. |
| 28 |
Fri.
|
Ship Inspection, Welding Inspection,
Schedule Planning, etc. |
| July 1 |
Mon.
|
Ship Design, Reporting |
| 2 |
Tue.
|
Ship Inspection, Reporting |
|
Practical Training Schedule
Oshima Shipbuilding
Training Period: June 13 (Thu)〜July 2 (Tue), 2002
Names of Participants:
Mr. Malakai Koroi Cakau (Fiji)
Mr. D.A. Dayanandasiri (Sri Lanka)
Mr. G.V.T. Nanayakkara (Sri Lanka)
| Date |
Training Item |
| Jun.
13 |
Thu.
|
Instruction of Deign Department |
| 14
|
Fri.
|
Calculation System for Initial Planning
Section |
| 17
|
Mon.
|
Calculation System for Initial Planning
Section, Design-Flow of Hull Structure, FEM, 3D-Product |
| 18
|
Tue.
|
Stern/engine room vibration check,
MATE/NESTING System, Shipbuilding Quality Manual |
| 19
|
Wed.
|
Piping Diagram (Stem-Bilge ballast,
Fuel Oil-Exhaust gas) Productive Design in Engine Room |
| 20
|
Thu.
|
Accommodation arrangement, Painting,
Cathodic protection, Productive Design for Hull Outfitting |
| 21
|
Fri.
|
Electric Power Table, Main Distribution
System, Builders Standard Practice for Electrical Installation |
| 24
|
Mon.
|
Mount of Anchor |
| 25
|
Tue.
|
Sea Trial |
| 26
|
Wed.
|
Sea Trial |
| 27
|
Thu.
|
Accommodation on Board |
| 28
|
Fri.
|
Accommodation on Board |
| 29
|
Sat.
|
Bow Construction on Board |
| 2
|
Tue.
|
Quality Assurance, Reporting |
|
Practical Training Schedule
Kyokuyo Shipyard
Training Period: July 4 (Thu)-July 24 (Wed), 2002
Names of Participants:
Mr. Yan Sibarang Tandiele (Indonesia)
Mr. Watchara Chiemanukulkit (Thailand)
| Date |
Training Item |
| July4 |
Thu. |
Introduction of Shipyard and Orientation,Guidance
of Shipbuilding |
| 5 |
Fri. |
ISO & Quality Assurance |
| 8 |
Mon. |
Ship Design (General) |
| 9 |
Tue. |
Ship Design (Detail) |
| 10 |
Wed. |
Construction Schedule and Facilities |
| 11 |
Thu. |
Hull Construction |
| 12 |
Fri. |
Outfitting |
| 15 |
Mon. |
Hull Outfitting |
| 16 |
Tue. |
Machinery Fitting |
| 17 |
Wed. |
Electric Fitting |
| 18 |
Thu. |
Piping |
| 19 |
Fri. |
Ship Inspection |
| 22 |
Mon. |
Ship Repairing |
| 23 |
Tue. |
Purchasing |
| 24 |
Wed. |
Discussion |
|
Practical Training Schedule
Odo Shipbuilding & Engineering
Training Period: July 4 (Thu)-July 24 (Wed), 2002
Names of Participants:
Mr. Malakai Koroi Cakau (Fiji)
Mr. D.A. Dayanandasiri (Sri Lanka)
Mr. G.V.T. Nanayakkara (Sri Lanka)
| Date |
Training Item |
| July 4 |
Thu.
|
Orientation, Safety Instruction,
Outline of Shipyard |
| 5 |
Fri.
|
Ship Construction Process |
| 8 |
Mon.
|
Inspection of Tug Boat, Outline
of Tug Boat |
| 9 |
Tue.
|
Trail test of Tug Boat. |
| 10 |
Wed.
|
Performance of ZP Tug Boat. |
| 11 |
Thu.
|
Tug Boat Design |
| 12 |
Fri.
|
Tug Boat Design |
| 15 |
Mon.
|
Quality Control |
| 16 |
Tue.
|
Maintenance of CPP Propeller |
| 17 |
Wed.
|
Maintenance of Main Engine |
| 18 |
Thu.
|
Block Construction of New Ship,
Welding Process, etc. |
| 19 |
Fri.
|
Operation of Tug Boat |
| 22 |
Mon.
|
Inspection and Maintenance of Life
Raft |
| 23 |
Tue.
|
Reporting |
| 24 |
Wed.
|
Reporting |
|
|