5. Programme of work (continued):
5.3. Possible proposals for new work items (6*)
Preliminary work items under consideration for ISO/TC 8/SC 3 have been identified as follows:
(03.39) Ships and marine technology - Centrifugal pumps for shipboard use
Responsible Working Group WG 3 - USA
[New work item proposal anticipated, but date is uncertain.]
(03.43) Ships and marine technology - Lubricating oil systems - Guidance for grades of cleanliness and flushing
Responsible Working Group TBD
[New work item proposal anticipated, but date is uncertain.]
(03.44) Ships and marine technology - Hydraulic oil systems - Guidance for grades of cleanliness and flushing
Responsible Working Group TBD
[New work item proposal anticipated, but date is uncertain.]
(03.45) Ships and marine technology - Hydraulic oil systems - Guidance for assembling and flushing
Responsible Working Group TBD
[New work item proposal anticipated but date is uncertain.]
(03.46) Ships and marine technology - Sampling from lubricating oil and hydraulic oil systems - Guidance for sampling of representative samples for determination of degree of cleanliness and for solid particle contamination
Responsible Working Group TBD
[New work item proposal anticipated, but date is uncertain.]
(03.48) Ships and marine technology - Spray shields for mechanical joints in flammable liquid piping
Responsible Working Group TBD
[New work item proposal anticipated, but date is uncertain.]
6. Meetings held since last plenary meeting of TC8:
The sixth annual meeting of SC3 was held in London, England, 2000-09-06 through 2000-09-08.
7. Schedule of future meetings:
The seventh annual meeting of SC3 is tentatively scheduled to be held in The Netherlands in September 2000.