Page 8 Achieve ignition of the crib by burning commercial grade heptane in a square steel tray 0.25 m2 in area. During the pre-burn period the crib should be placed centrally above the top of the tray a distance of 300 to 600 mm.
Page 8
Achieve ignition of the crib by burning commercial grade heptane in a square steel tray 0.25 m2 in area. During the pre-burn period the crib should be placed centrally above the top of the tray a distance of 300 to 600 mm.
前ページ 目次へ 次ページ