Preliminary Stage
[01.19] Inflatable life raft stability
[01.20] Composite materials
[01.21] Powered pilot hoists, WG 2, IMO-link-NR43, NWIP to be considered
[01.23] Fire test procedure for approval of non-combustible composites
[01.24] Fire test procedure for approval of composites use on HSCs
[01.25] Fire door construction standard
[01.26] Fire test procedure for approval of glass divisions and windows
[01.27] Test method for approving Low location lighting systems, IMO-link-NR 17
[01.28] Standard for placement of shipboard fire extinguishers
[01.29] Supplement for fixed water mist fire extinguishing systems
[01.30] Test method for approving fire extinguishers
[01.31] Standard for approving Halon alternative agents and fire extinguishing systems, IMO-link-NR17 NR 21, (interest SC3, although unlikely)
[01.34] Width of escape stairways on passenger ships, IMO-link-NR 16
[01.35] Projects related to new IMO LSA (Life saving appliance) Code, IMO-link-NR 18, (according to SC 1 secretariat this item is far too general)
[01.36] Standard test reports for reciprocal recognition (Immersion suits, anti exposure suits, thermal protective aids and marine evacuation systems), IMO-link-NR 19
[01.37] Alternative sprinkler systems, IMO-link-NR 20 (interest SC 3)
[01.38] Design and operation of passenger ships to the needs of elderly and disabled persons, IMO-link-NR 38
[01.39] Shipboard fire control plans (see item [01.22] and [01.45], what is the relation ?)
[01.40] Risk analysis of escape routes, IMO-link-NR 38
[01.42] Production testing of life-jacket lights (and other position indicating lights), WG 1, (UK),IMO-link-NR 61
[01.43] Prototype testing of pyro technic life-saving appliances, WG 1, (Comet GmbH)
[01.45] Type and arrangements of safety signs, WG 3 (see item [01.22] and [01.39], what is the relation)
Deleted items
[01.09] deleted ISO/NP 14613 Embarking and leaving ship in open water, IMO-link-NR 43
[01.10] deleted
[01.15] deleted, ISO/TC 8/SC 1 Resolution 19-1998* ISO/NP 15737 Ships and marine technology -Life-jacket lights - Testing
[01.44] deleted, see item [01.21] Powered Pilot hoists, WG 2
[01.05] deleted
[01.07] deleted
[01.46] deleted
[01.47] deleted
[01.48] deleted
[01.49] deleted
[01.50] deleted
[01.51] deleted
[01.52] deleted