Piping and Machinery Subcommittee (SC 3)
Secretariat
Exception report on the progress of work in ISO/TC 8/SC 3(continued)
3. Changes in the programme of work (continued):
(03.35) ISO/DIS 3715-2 "Ships and marine technology-Propulsion plants for ships-Part 2:Terms and definitions for controllable pitch propeller plants"(Revision of ISO 3715:1978)
Responsible Project Leader Mr.H.-Ch. Schade(DIN)-Germany
Stage 40.20*
Target date for FDIS ballot(50.20) 99-10
Target date for publication(60.60) 00-02
[Distributed for DIS ballot on 1998-11-26. Voting ends on 1999-04-26;
CEN enquiry for parallel voting received]
(03.07) ISO/DIS 5483 "Ships and marine technology - Drain plugs, welding rings, and gaskets for oil and water tank drains" (Revision of ISO 5483:1977)
Responsible Project Leader Mr.A.W.van Dijk(DS) - Denmark
Stage 40.20*
Target date for FDIS ballot(50.20) 99-09
Target date for publication(60.60) 00-01
[Distributed for DIS ballot on 1998-11-26. Voting ends on 1999-04-26;
CEN enquiry for parallel voting received]
(03.14) ISO/DIS 7547 "Ships and marine technology - Air-conditioning and ventilation of accommodation spaces on board ships - Design conditions and basis of calculations"(Revision of ISO 7547:1985)
Responsible Working Group WG7-USA
Stage 40.20*
Target date for FDIS ballot (50.20) 99-10
Target date for publication (60.60) 00-02
[Distributed for DIS ballot on 1998-12-04. Voting ends on 1999-05-03]
(03.20) ISO/CD 9785 "Ships and marine technology - Ventilation of cargo spaces where internal combustion engine vehicles may be driven - Calculation of theoretical total airflow required"(Revision of ISO 9785:1990)
Responsible WG/Project Leader WG7/Mr.Wayne Lundy(USCG)-USA
Stage 30.60
Target date for DIS ballot(40.20) 99-07*
Target date for FDIS ballot(50.20) 00-07*
Target date for publication (60.60) 01-01*
[Proposed DIS being prepared for submission to the ISO/CS]