−Part 23 DIS to be submitted for QIE (Qualification, Integration and Editing)
−Part 24 C language: second CD vote in early July
−Part 26 IDL language: Ready for qualification after Toronto Meeting and CD vote in early 1997.
−EXPRESS-X details can be obtained from http://www.rdrc.rpi.edu!express.X/
−Express 2nd edition's relationship with EXPRESS-X is to be clarified
−National character set has impact on Parts 11 and 21 (This is of special importance to Japan, China and Korea due to Ranji)
−WG11 liaison with JTC1/5C21IWC3 is needed
8) SC4 Quality Committee
−Team and Tasks are proposed
−Joint meeting was held with WG10 to sort out AP221 development issues
−WG4IP1 qualified 302, 303, 304 and 212 for CD Plans:
−Draft resolution to be submitted for resources and tasks and structure of QC
−AP 216 pilot interpretation workshop is to be organized in September to provide
Interpretation and to develop metrics. Interpretation experts are to be pooled for this purpose.
−Editor's training is to be held at Toronto
−Update qualification and validation procedure for Aps.
−A main issue is the lack of resources for Pub and MANDATE representation
2. Committee Reports
1) Express Project:
No comment was made
WG2 and WG3/T1 held joint meeting for:
−Parametric architecture discussion with WC2
−Infrastructural requirements (Plib Part20, Changes to EXPRESS and Part 41, EXPRESS-X and -I,..)
−Discussion on features, assemblies, tolerances and geometrical accuracy WG 10 is to be included in Parametric discussions as requested during the presentation.
3)PPC (Policy and Planning Committee):
−Review of organizational efforts (QC, WG6/WG11, WG3/WG12)