−Scope modified to Manufacturing (production) management data
−Project P1 external communication architecture of SC4
−Harmonization with overall standards architecture of SC4
−Joint meeting with WG10 is planned at Toronto
−Testing Requirements and EXPRESS extensions were transferred to WG11
−Project P1 status: Preliminary state of work, reassess the requirement for a specific standard, Discussion about using the results of BSR project, New work item necessity to be discussed
−Project P2 status: standard on manufacturing resources usage management data;
Project P2 is divided into three parts
−Project P3 was not met. There are three parts: 25, 26 and 27 which are ready for CD ballot.
5) WG9 −Electrical/Electronic applications
−AP212 Discussion with WG2 and WG10
−AP210 DIS will be ready in SGML by year end
−AP210-212 interoperability. Ensure at IS stage
−AP211: funding is explored for continuation
−IEC liaison and harmonization
6) WG10 −Technical Architecture
−Joint meetings with QC (Quality Committee), and WG2 were held
−Interoperability action plan is planned for Toronto: Also included are ship APs 217,218, and 226