日本財団 図書館


023-1.gif

Operation of main source of electrical power and steering gear

In areas where navigation demands special caution, ships shall have more than one steering gear power unit in operation when such units are capable of simultaneous operation.

 

023-2.gif

Steering gear: Testing and drills

1 Within 12 hours before departure, the ship's steering gear shall be checked and tested by the 1 ship's crew. The test procedure shall include, where applicable, the operation of the following:

.1 the main steering gear;

.2 the auxiliary steering gear;

.3 the remote steering gear control systems;

.4 the steering positions located on the navigation bridge;

.5 the emergency power supply;

.6 the rudder angle indicators in relation to the actual position of the rudder;

.7 the remote steering gear control system power failure alarms;

.8 the steering gear power unit failure alarms; and

.9 automatic isolating arrangements and other automatic equipment.

2 The checks and tests shall include:

.1 the full movement of the rudder according to the required capabilities of the steering gear;

.2 a visual inspection for the steering gear and its connecting linkage; and

.3 the operation of the means of communication between the navigation bridge and steering gear compartment.

3.1 Simple operating instruction with a block diagram showing the change-over procedures for remote steering gear control systems and steering gear power units shall be permanently displayed on the navigation bridge and in the steering compartment.

3.2 All ships' officers concerned with the operation or maintenance of steering gear shall be familiar with the operation of the steering systems fitted on the ship and with the procedures for changing from one system to another.

 

 

 

BACK   CONTENTS   NEXT

 






日本財団図書館は、日本財団が運営しています。

  • 日本財団 THE NIPPON FOUNDATION