・The large (1000 tonne for container ships)(1200 tonnes for Panamax tankers) super modules have to be lifted off the ~sporting equipment and lowered into the dock.
・The transporters will be rubber tire type and will be a combination ofthe existing (2) Scheuerles plus (2) modular units.
・This will require new larger capacity Kevlar straps and another hydraulic levelling system.
・The Ringer cranes will place the transporters into the Graving Dock. The units will then be lowered onto them and advanced in the dock.